All but done
It appears to us that there isn't much left to do, so this week we mostly enjoy using our new facilities. Take a look at the pictures. You can expect future updates to be a little more sporadic.
Pictures.
January 28, 2006
Moving Along
Your website photography
team was out of town last week, so we have two
weeks of progress to report. As we approach the
end of the project, we still see progress, but
you have to look a little harder. But we're
also happy to see that the new spaces are being
used and to find members moving into the new
areas as well ac tidying up after all the
construction activity.
Pictures
January 12,
2006
Measured Progress
The answer to the question, "Why is it
taking so long?" can be found in this weeks
picture story.
Pictures
January 05, 2006
Welcoming
New doors are added to make our church more
welcoming
Pictures
December 28, 2005
Back to Work
The party's over so let's get back to work.
Click on the link below to see the what's going
on this week.
Pictures.
December 22,
2005
A Christmas Card
In addition to celebrating the progress on
the construction, this week we have much more
to celebrate. Click on the "pictures" link
below for a sample of both the decorations and
the construction progress.
Pictures
December 13,
2005
The key word this week is
"lift". Click on pictures below to hear more
about it and see the latest pictures.
Pictures
December 7,
2005
The building project continues with final
work being done on the elevator, lift and on
the exterior doors. The ceiling of the Grand
Foyer is in place.
Pictures
December 1,
2005
Construction continues to make progress, and
my level of anticipation is high. We hope
to use the Nursery for the first time this
Sunday at both services. The Grand Foyer
has a ceiling and heat...or so we hope.
You should be able to enter via the main
entrance off the parking lot, but if not, the
old office entrance will be available so you
don't need to travel around outside. Even
Mary and Joseph have found a new location by
the church sign as they await the birth of
Jesus. We plan to decorate the sanctuary
on Saturday, December 17th following a class on
Christmas Bow making.
Pictures
November 24,
2005
There has been more progress
on the drywall in the foyer (closing up what
was open) and also a new railing in the balcony
(opening up the view of the sanctuary.)
Pictures
November 17, 2005
Putting up drywall in the
foyer
Pictures
November 10, 2005
Construction continues as
doorknobs are added, stairs are redone, and the
Grand Foyer lift is readied. It is brighter as
well.
Pictures
November 3, 2005
The chancel floor is finished.
It is not slippery, but I misstepped during the
baptism as I carried Kendall to be introduced
to you. My thanks to Warren Saur for improving
the pulpit (come and see what I mean) as well
as the lectern. We continue to wait and see how
we are using the chancel area and sound system
before we introduce the railing into the floor.
This week we have made great progress as the
divider walls for downstairs have been
delivered, first floor restrooms are completed,
and we have hot water.
Pictures
October 27, 2005
We are warm and almost
accessible. It seems that much of what we
are waiting for will require at least another
week. The altar floor has it's first coat
of stain and varnish and looks beautiful- two
more will be added next week so we tread softly
this weekend. The final shape of the
building is easy to visualize, and the workers
will hopefully need less than 6 weeks to
finish. We continue to accommodate, not
eliminate! This weekend promises to be
warm and sunny, so please come and see what is
new at St. Paul's.
Pictures
October 19, 2005
You can enter from the driveway
through the old office door. We have our
own heat! The gas has been connected and
you can feel relatively comfy at church this
Sunday. Windows are in the Grand Foyer,
work is almost done on the elevator, the
downstairs is usable for SCS and Scouts, and we
are nearing the home stretch. Invite a
friend to church.
Pictures
October 13, 2005
If you have not seen the church building
recently, you will be amazed at the difference
a week makes. We have been given a
temporary certificate of occupancy for the
downstairs, so we will be able to do the
teaching of Sunday Church School in its regular
area. Come and see the new space.
The roof line is completed, the sound system
has been added, the toilets have been tiled,
the carpet is half-down in the Fellowship Hall,
and the balcony floor is complete. Come
and see, go and tell.
Pictures
October 6, 2005
You should be impressed with the tremendous
amount of work accomplished on the building
this week. We have a roof on the Grand
Foyer, the walls downstairs are painted, new
toilets, drinking fountains and the elevator
have been installed, the choir loft wooden
floor has been laid, and the sound system and
altar will be worked on next week
Pictures
September 29,
2005
New tables and chairs and cabinets have
arrived for the Sunday Church School. The
downstairs has been painted and needs carpeting
before we can have classes. Partitions
are ready to be installed. The roof over
the Grand Foyer is nearly complete, and then
the work on the walls begins. Toilets
have tiles, electricity has a new home, and the
heat is waiting only for the gas hook-up.
If you think you will be cold this Sunday,
please bring a sweater. We have no coat
racks, so use the pews for now.
Pictures
September 22,
2005
Our building is making
progress, and the new Grand Foyer is almost
enclosed. Plasterers, painters,
electricians, plumbers and men from the heating
company have all been present this week.
Pictures
September 21, 2005
Pouring the concrete floor in
the foyer, thanks to Mara Berndt.
Pictures
September 15, 2005 Update
The building is making great progress with
the new nursery being painted, the sanctuary
floor taking shape, and the downstairs
classrooms coming together. It is a good
time to be the church.
Pictures
September 08, 2005 Update
Progress continues at the building, although
I wish it would show more visible
changes. Walls are up, wires are in, and
much has been done, but more is yet to get us
ready for SCS. Keep the good thoughts
coming.
Pictures
September 01, 2005 Update
In spite of Wednesday's rain, the building
project has made noticeable advances. The
walls are up in the nursery and main floor
areas, the walls are up for the Grand Foyer (it
is a large space), and plumbing and electrical
needs are being met. We hope to be able
to use much of the main floor and lower level
by mid-September. The elevator people
have been here and all kinds of good things are
happening. It is my hope that you will
make an effort to share the excitement.
We appreciate the generosity of so many that
are making this happen. Are there any
more of you who would like to make sure that
everything we should have is provided so
that this build is a center for mission
in our community? Your ongoing
support is vital.
Pictures
August 25, 2005 Update
Our building has had a number of
electricians, plumbers and carpenters making
significant progress with heating, bathrooms
and framing the walls of the new Grand
Foyer. The entrance areas have been
outlined with base materials, and the idea that
this is really a CONstruction project rather
than a DEstruction project is starting to take
shape. Much of the space should be
functional by mid-September. Sunday
Church School is shooting for a Sept. 25th
starting date. We are in the process of
securing information for the needed tables and
chairs. We are continually impressed with
the quality of work and the cooperation of the
contractor, DGA. Stop by and we can offer
small tours when it is safe to do so.
Pictures
August 14, 2005
Update
Those who
have toured the church are amazed at the size
of the project we are doing and the speed at
which it is being completed. The new
sound system, though not completely in, is
functioning along with the hearing loop. Please
let us know if we are too loud or soft, as we
can make adjustments. The speaker cover
will be painted, as well as touch ups made to
the sanctuary paint. This week the
concrete floor to the grand foyer was poured
and you can visualize the size of this
room. Plumbers have been busy plumbing
and electricians wiring. The LULA
(elevator) roof has been installed, and the
downstairs steel beams delivered for the
dividers. Sunday Church School is our
highest priority and we are hoping to start by
the end of September. We are also looking
for community groups that need a space to meet
on a regular basis.
Inside pictures.
Outside pictures
(Note:
Pictures are temporarily offline.)
April 10, 2005
The
Groundbreaking.
Pictures
|